ENCLOSURE PROCUREMENT — RFQ AND DELIVERY TEMPLATES Version 2.0 | 3 October 2026 Blank working forms; complete with the responsible project team. REQUIREMENT AND COMPARISON RECORD Project reference: ______ Package category: ______ Candidate model/configuration/seller: ______ Requirement: ______ Mandatory: yes/no Assessment: meets / deviation / unverified Evidence, revision, date and reviewer: ______ Currency and complete installed cost: ______ Inclusions / exclusions / unpriced items: ______ Recommendation conditions and approval: ______ Resolve mandatory requirements before approving the selected offer. RESPONSIBILITY MATRIX Design approval | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Factory modifications | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Factory inspection/testing | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Export documentation | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Freight and insurance | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Import clearance and duties | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Unloading | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Storage and preservation | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Lifting and positioning | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Foundations and anchoring | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Electrical installation | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Commissioning and site testing | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Handover documents | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ Warranty and spare parts | Responsible party: ______ | Scope/evidence: ______ | Accepted by: ______ DELIVERY MILESTONES Design release | Planned: ______ | Actual: ______ | Owner/evidence: ______ Drawing approval | Planned: ______ | Actual: ______ | Owner/evidence: ______ Production complete | Planned: ______ | Actual: ______ | Owner/evidence: ______ Factory inspection | Planned: ______ | Actual: ______ | Owner/evidence: ______ Dispatch | Planned: ______ | Actual: ______ | Owner/evidence: ______ Customs clearance | Planned: ______ | Actual: ______ | Owner/evidence: ______ Site arrival | Planned: ______ | Actual: ______ | Owner/evidence: ______ Installation | Planned: ______ | Actual: ______ | Owner/evidence: ______ Handover | Planned: ______ | Actual: ______ | Owner/evidence: ______ SUPPLIER REFERENCE CHECK Comparable project and location: ______ Scope delivered: ______ Promised / actual dates: ______ Quality issues and resolution: ______ Evidence and permission to contact: ______ Permission to share the reference with the project team: ______ HANDOVER CHECKLIST [ ] Model and configuration match approved order [ ] Packing and visible damage inspected [ ] Accessories and documents counted [ ] Storage/handling conditions confirmed [ ] Installation and tests signed off by responsible parties [ ] Outstanding items assigned an owner and due date [ ] Final drawings, manuals, spares and warranty contacts received