Design the internal support
Check guide spacing, insertion direction, board outline and connector overhang. apra’s PROFI CASE page describes guide features and alternative side sections; choose a configuration around the actual board design.
Verify the assembled unit
Use a pilot assembly to check retention, service removal and connector loads. Define any supplementary supports and insulation in the build drawing. Confirm whether ventilation openings suit the installation environment.
Further reading & sources
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.