Set a performance brief
Ask the design team to define the requirements for the actual building, use and jurisdiction. Cover structural loading, weather resistance, thermal performance, fire strategy, acoustics and durability where relevant. Supplier product data should be evaluated against this brief.
Resolve the interfaces
Identify who designs and supplies the joints, flashings, seals, penetrations, support structure and connections to windows and doors. Unclear package boundaries can produce gaps in price, responsibility and warranty coverage.
Compare the complete installed offer
Request a schedule covering panels or modules, support systems, installation, lifting, transport and documentation. Ask which tolerances and site conditions the offer assumes. A saving on the supply price is less useful if it adds unpriced work elsewhere.
Use project-specific evidence
Check that supporting tests and approvals apply to the proposed configuration and market. A product-family claim is not approval of every thickness, fixing arrangement or building application. The project design team should confirm acceptability before purchase.
Further reading & sources
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.