A smaller cabinet, a coordinated equipment package
Rittal’s Enterprise Infrastructure Solutions case study describes a customer using multiple data centres with different space constraints. A low ceiling prevented use of a standard 42U enclosure. Rittal reports supplying a 33U configuration for that location and adapting its cable management, accessories and power distribution units to fit.
What this means for your next cabinet order
Treat a dimensional change as a package review. Check internal capacity and every dependent accessory before accepting a smaller cabinet. Obtain a site survey, coordinated arrangement drawing and an approved bill of materials. Include both the transport route and the final operating position in that review.
Build access into the quotation
Give the supplier the access survey and required equipment capacity together. Ask for a complete configuration covering cabinet, power distribution, cable management and installation accessories. Agree the drawing revision, delivery route and handling plan before production, so a change in cabinet height is reflected throughout the package.
Further reading & sources
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.