Define the project conditions
Record riser and plant-room dimensions, door swings, maintenance routes, public access, service connections and construction phasing. Identify the consultant’s approved specification and substitution process.
Build a complete enquiry
Request coordinated drawings, an accessory schedule, delivery booking requirements and a clear boundary between enclosure supply, electrical assembly and installation.
Make delivery part of the specification
Book delivery against the construction programme and the available plant-room access. Resolve responsibility for positioning, fixings, electrical assembly and final connections. Compare offers with the same accessory schedule and installation boundary.
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.
