Work back from the required service date
Create milestones for design release, drawing approval, procurement, manufacture, inspection, dispatch, customs clearance, site arrival, installation and handover. Ask when the supplier’s quoted lead time starts and which customer inputs can pause it. Separate factory readiness from arrival at the actual installation site.
Survey the physical route
Obtain packed and assembled dimensions, shipping and installed weights, centre-of-gravity information where needed, and model-specific handling instructions. Check vehicle access, unloading space, doorways, corridors, floor loading, headroom and the final position. For large or joined cabinets, ask whether transport in sections is permitted and how reassembly is controlled.
Allocate every delivery responsibility
Specify the named delivery place and agreed trade term, then separately allocate unloading, positioning, installation and commissioning. ICC distinguishes DAP and DDP in part through responsibility for import clearance and duties; both need a precise destination. Have the commercial team confirm the full contract and local import arrangements rather than assuming a short shipping label settles the whole scope.
Prepare the site and preserve the equipment
Agree the packaging, storage environment, inspection on arrival and damage-reporting process. Identify responsibility for foundations, anchoring, cable routes, lifting equipment, permits and labour. Use the exact manufacturer’s handling and mounting instructions and a competent site team’s installation method. Confirm access for later service as well as initial installation.
Use a handover checklist
Close out inspection records, test results, drawings, operating instructions, spare parts and warranty contacts. Maintain an outstanding-items list with an owner and due date. Require acceptance against the agreed scope; delivery of a cabinet alone is not confirmation that the installation package is complete.
Further reading & sources
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.