Freeze the interfaces
Record the board revision, connector positions, keypad artwork, fastening method and service opening. Review an assembled sample, including cables and internal supports; an empty housing alone will not demonstrate fit.
Control the release
Agree sample acceptance criteria, drawing revision, tooling ownership, change notice and the treatment of rejected units. Keep prototype and production lead times separate in the quotation.
Further reading & sources
General procurement guidance. Confirm project-specific requirements with the responsible design team and the supplier.
Use this on your project
Download the requirements and delivery templates or record a comparison against your specification.
